Safety Awareness Sessions on our sites
|
We always conduct safety
induction programs, demonstrations, awareness
sessions and training session on our each project
sites. We also have safety park erected on our each
and every site. |
 |
 |
 |
|
 |
 |
 |
Our Safety Routine
|
 |
Safety Committee
- It
includes, Site PM/QAE/Store keeper/Safety
representative
- A safety
representative may be a JE or a supervisor
- At least
one meeting in a month should be held at site &
MOM should be forwarded to Head Office
- Safety
representative shall deliver speeches on
preventive measures to workers for running
activities on weekly basis
- Safety
representative shall maintain the records
- Safety
representative should display a list of
following emergency telephone numbers on notice
board in site offices - Fire, Ambulance, Police
station, Nearest Hospital / Doctor, Client
Representative, Consultant / Arch. Engineer,
Project Manager
|
 |
 |
Personal Protective Equipment (PPE)
- Safety
Helmets
- Safety
belts used for workmen working on heights
- Hand
gloves used for material handling, gas cutter
etc.
- Safety
goggles used for welding, grinding, concrete
breaking
- Gumboots
for concrete work, cutting hard rocks,
asphalting
|
 |
 |
First Aid Kit
- Dressing
cotton
- General
Medicines
- 1” roller
Bandage
- 3” roller
Bandage
- Potassium
Permanganate
- Iodine
bottle
- Dettol,
Burnol & Sofromycene
- Knife &
Scissorsg
|
|
|
 |
 |
Equipment Safety
- Only
trained operator should handle mechanical &
electrical equipment
- Ensuring
mixer machine & weigh batcher is in perfect
level before starting
- Insertion
of the loose wires in sockets without a plug
should be avoided
-
Switchboards installed in open area should be
protected from rain
- Cube
testing machine should be covered after testing
the cubes
- Vibrators
and needles should be cleaned properly after its
use
- Avoid
bending the needle while in running condition
|
 |
 |
Preventive Measures |
Excavation |
Concreting in foundations |
Slab form work |
- Barricade
the excavated area by barricading tapes
|
- Shoring &
Strutting of trench/pit
|
- Fix props
truly vertical with proper bracing
- Center
steel span pin to be tightened properly
- One
attendant should be there where materials are
likely to fall
|
Concreting of slab |
Welding |
Masonry & Plaster |
- Ensure
the lift scaffolding installed / remains
vertical
- Avoid
throwing of unused materials from upper floors
- Walkways
to be used for walking on slab reinforcement
|
- Welding
work should be away from the damp area
- Temporary
cables to be installed at height and not on
floor
- Cable
joints to be properly insulated
- Welding
work should be done using gloves and protective
eye gear
|
- Throwing
of waste materials should be avoided
-
Scaffolding should be sturdy & properly braced
|
|
Housekeeping |
Mandatory |
|
- Empty
cement bags should be stacked properly after
work
- All
shuttering materials should be stacked in
defined areas
- Neatness
should be maintained at entire site
|
- Use
hooked/anchored safety belts when working on
height
- Use of
helmets is must while on site
|
|
|
|
 |
|
|
|